top of page

Our Clients

Moses Lake School District

Grant County Fair Grounds

Groat Brothers INC

Capstone Structures LLC

Palouse Power LLC

Advanced Excavation INC

Neppel Electric 

Inspire Development Centers

System Transportation

Wheeler Excavation

3 Kings Environmental INC

Big-D Construction

Valley Electric

Our Past Projects

Microsoft CO9

Install 1,150' LF 6' Black Fuse Bond Chain-Link with 2 - 20' slide gates and 1 pedestrian gate with panic hardware.

Currin Substation (Eugene Oregon)

Install 1,250' LF Shakespear Safe Fence non conductive sound barrier with 3 - 20' double drive gate systems.

Inspire Development Centers (Kennewick)

Remove 1,000' LF chin link fence and replace with 6' black 8ga chain link with 3 panic exit devices with coded entry.

Inspire Development Centers (Warden)

Remove 1,250' LF chain link fence and replace with 6' 8ga black chain link fence.  4 panic exit devices, 2 coded in, 6 free exit devices.

Inspire Development Centers (Grandview)

Remove 1,600' LF chain link fence and replace with 6' 8ga black chain link with 5 auto closing gates with 2 coded in with free exit.

Inspire Development Centers (Moses Lake)

Remove 1,200' LF chain link fence and replace with 6' 8ga black chain link.  3 panic exit devices with 1 coded entry with free exit.

Huard Substation

Install 950' LF Domestic 7' 2oz 9ga with 1083 40wt framework and 3 strands of barbwire.  3 double drive gate systems and 4 man gates.  With privacy slats

Betta's Substation

Install 750' LF Domestic 7' 2oz 9ga with 1083 40wt framework and 3 strands of barbwire.  2 double drive gate systems.

DOT Switchyard

Install 250' LF Domestic 8' 2oz 9ga with 1083 40wt framework and 3 strands of barbwire. 1 double drive gate system.

Ruppert Substation

Install 950' LF domestic 7' 2oz 9ga with 1083 40wt framework and 3 strands of barbwire.  2 double drive gate systems, 4 man gates, with privacy slats.

bottom of page